Select a Category
Free Shipping on orders over $500.00
38 products
TURBOCHARGER ASSY, Rebuilt
TURBOCHARGER ASSY, Rebuilt
TURBOCHARGER ASSY, Rebuilt
TURBOCHARGER ASSY, Rebuilt
TURBOCHARGER ASSY, Rebuilt
TURBOCHARGER ASSY, Rebuilt
TURBOCHARGER ASSY, Rebuilt
TURBOCHARGER ASSY, Rebuilt
TURBOCHARGER ASSY, Rebuilt
TURBOCHARGER ASSY, Rebuilt
TURBOCHARGER ASSY, Rebuilt
TURBOCHARGER ASSY, Rebuilt
TURBOCHARGER ASSY, Rebuilt
TURBOCHARGER ASSY, Rebuilt
TURBOCHARGER ASSY, Rebuilt
TURBOCHARGER ASSY, Rebuilt
TURBOCHARGER ASSY, Rebuilt
TURBOCHARGER ASSY, Rebuilt
TURBOCHARGER ASSY, Rebuilt
TURBOCHARGER ASSY, Rebuilt
AeroForce Factory Rebuilt Turbochargers
Applications for nearly any size and performance requirement, spanning the engine range from the Rotax 914 to the largest big bore Continentals and Lycomings used in pressurized aircraft. Produced on advanced CNC equipment, inspected using precision coordinate measuring machines (CMMs), and accurately balanced using high-speed balancing equipment (capable of balancing to speeds in excess of 100,000 rpm).
We also offer factory new assemblies.
AeroForce turbochargers, pressure relief valves, wastegates, and controllers is the best choice for new and rebuilt turbocharging systems. By utilizing exhaust gases to drive a turbine, AeroForce turbochargers compress incoming air, increasing oxygen concentration for improved engine combustion. This process maintains engine power at altitude, making them indispensable for pilots seeking consistent performance across various flight conditions.
Factory rebuilt turbochargers are thoroughly inspected and tested. Several new critical replacement components are installed on all rebuilt assemblies, including stressed turbine wheel assemblies, bolts, lock plates and nuts, piston rings, thrust bearings, seal rings, retaining nuts, and more.
All turbo-system components (turbocharger, wastegate, controller, and pressure relief valves) are overhauled in accordance with Hartzell Engine Technologies Recommended Service Facility (RSF) requirements:
Includes 100% replacement of the turbine wheel and center housing.
Click here to see the application guide. Confirm eligibility using this chart.